- Planned Fogging Date(s): 06/19/2023
- Time(s): Between 4:00 am and 7:00 am
- Multiple Day Mission: No
- Selected Cities: Ridgefield, Pioneer St
- Details: Lancaster Lake east to NW 51st Ave. NW 315 Cir. south to NW 291st St. South Pioneer St to S 6th Way, S 56th Pl to NE 259th Pl.
- Application Type: Adulticide
- Application Method: Truck (Fogger)
- Material: Duet (Pyrethroid-based product)
- Rate: .8 Oz/acre
- Total Acreage:
Treatment Schedules