Skip to content
Mon-Fri from 7am-3:30pm
  • Planned Fogging Date(s): 06/06/2023
  • Time(s): Between 4:30 am and 7:00 am
  • Multiple Day Mission: No
  • Selected Cities: NW Cornell Dr, Flume Creek, Krieger Rd, South Ridgefield
  • Details: North of 169th St. South of Flume Creek. East of Lake River. West of 51st Ave.
  • Application Type: Adulticide
  • Application Method: Truck (Fogger)
  • Material: Merus 3.0 (Pyrethrin-based product)
  • Rate: .8 Oz/acre
  • Total Acreage:
Back To Top